2022-02-07 21:28:47 Oberflächenspannungの投稿 hoernchen72@chaos.social
icon

このアカウントは、notestockで公開設定になっていません。

2022-02-08 07:02:15 Emily L'Orange 🦆🍊の投稿 emilylorange@mastodon.art
icon

このアカウントは、notestockで公開設定になっていません。

icon

@benoit The snow fell all at once and the switching point failed, so the train could no longer run. As long as the trains kept moving, the snow on the tracks would be removed, but that stopped too.
Railroad crossings have to be removed manually because cars trample the snow. The elevated tracks also have too much snow accumulating on them, so they need to be cleared from the side of the tracks to under the elevated tracks first.

2022-02-08 20:10:30 Eugen Rochkoの投稿 Gargron@mastodon.social
icon

このアカウントは、notestockで公開設定になっていません。